• AI-Agent
  • Ready to Run

Review Revised Site Drawings

Compare revisions with cleared field cards and prepare coordinator review

Use this Agent instantly or customize it - no programming needed

Recheck a revised drawing before field work continues
Reads
  • Current drawing revision
    Current drawing revision

    Your revised drawing shows the current version and the changes that triggered this review.

  • Earlier reviewed drawing
    Earlier reviewed drawing

    Your earlier drawing shows the version covered by the previous field work clearance.

  • Earlier field work clearance
    Earlier field work clearance

    Your linked field card shows the earlier decision, current status, and assigned reviewer.

  • Drawing review matrix
    Drawing review matrix

    Your review matrix identifies who must reconsider a drawing when its details change.

  • Field release rule
    Field release rule

    Your field release rule determines when a previous clearance can still stand.

  • Authorized reviewer names
    Authorized reviewer names

    Your coordinator list identifies the people who can receive a new review request.

Site drawing system
Site drawing system

Your site drawing system supplies the changed drawing and the version behind its earlier review.

Site drawing system
Field work card system
Field work card system

Your field work card system holds earlier clearance and receives the new pending review.

Field work card system
Is the reviewed drawing or earlier clearance missing?YesNo
Flag the drawing for manual reconciliation
Writes
  • Manual reconciliation flag
    Manual reconciliation flag

    Your coordinator sees that the reviewed drawing or earlier clearance needs to be found.

Do the rules leave the required reviewer unclear?YesNo
Hold the handoff and request a reviewer choice
Writes
  • Pending review hold
    Pending review hold

    Your field card stays on hold until a coordinator resolves the drawing review.

  • Reviewer choice request
    Reviewer choice request

    Your coordinator chooses an authorized reviewer when the rules leave that decision open.

Did the drawing change again during this review?YesNo
Reread the drawing and stop this outdated review
Create a linked pending review and hold the handoff
Writes
  • Drawing change summary
    Drawing change summary

    Your reviewer sees what changed and can open the current and earlier drawing versions.

  • Linked pending review
    Linked pending review

    Your coordinator receives a new review linked to the current drawing and earlier clearance.

  • Pending review hold
    Pending review hold

    Your field card stays on hold until a coordinator resolves the drawing review.

This Agent starts when a site drawing changes after field clearance. It compares versions using your review rules and opens a linked pending review. Your construction project coordinator sees the changes while the field handoff stays on hold.

Modify Agent

Customize this Agent to fit your needs using natural language.

Start Agent for Free

Enter your email address and we will send you a secure link to continue.

Google Drive
Used as:
Show all Agents working with Google Drive
Airtable
Used as:
Show all Agents working with Airtable
monday.com
Used as:
Show all Agents working with monday.com
ClickUp
Used as:
Show all Agents working with ClickUp
Google Contacts
Used as:
Show all Agents working with Google Contacts
Microsoft SharePoint
Used as:
Show all Agents working with Microsoft SharePoint
Basecamp
Used as:
Show all Agents working with Basecamp
Podio
Used as:
Show all Agents working with Podio
Pipefy
Used as:
Show all Agents working with Pipefy
Kintone
Used as:
Show all Agents working with Kintone

Made for your industry

Review Revised Site Drawings is made for businesses in these industries.

Made for your role

Review Revised Site Drawings is made for people in these roles.

Made for your department

Review Revised Site Drawings is made for people in these departments.

How Review Revised Site Drawings works

4 steps, in order, on every run.

  1. Read the revised drawingRead the current and previously reviewed versions. Flag a missing reviewed version for manual reconciliation.
  2. Check the cleared field cardRead the linked field card and its earlier clearance. Flag missing clearance for manual reconciliation without opening a new approval.
  3. Apply your review rulesCompare the revision with earlier clearance. Use your drawing-review matrix and field release rule to identify required reviewers.
  4. Open a linked pending reviewLink the current version and old clearance in a pending review. Show the changes and keep the field handoff held.

How to Get Started

Connect your tools

Connect the tools you already use, such as Google Drive, Airtable or monday.com.

10 tools
Set your rules
  • Connect the reviewed site drawing location and identify the linked earlier review or decision field.
  • Enter the drawing-review matrix and field release rule, authorized construction project coordinator names, and the status that holds handoff pending review.
  • Limit access to the site drawing and review destination to the responsible team.
Launch the Agent

Use safe mode to approve every result before it goes out, or let the Agent run automatically.

FAQs

Frequently asked questions about the Review Revised Site Drawings:

What do I need to set up?

Link each drawing to its earlier clearance and reviewed version. You choose the review rules and authorized coordinators. You also set the status that holds handoff.

What if the rules do not name a clear reviewer?

Your construction project coordinator chooses an authorized reviewer. The field handoff stays held until the review is resolved.

Can an unchanged approval carry forward?

Yes, when your drawing-review matrix and field release rule allow it. Your construction project coordinator still makes the final decision.

What if the drawing changes again during review?

The Agent rereads the drawing and stops before opening an outdated request. Your coordinator can then review the current version.

What happens when the Agent is unsure?

It stops and asks you. The Agent does not guess when it reaches a decision you have not approved.

Can I review its work?

Yes. Every run creates a plain-language log that you can review and export. Logs are kept for twelve months.

What happens if I cancel?

The Agent stops at the end of the billing month and its tool connections are removed. Your run logs remain available for twelve months.

Related Agents

Agents related to Review Revised Site Drawings

More ready-to-run Agents for connected work.